The store will not work correctly in the case when cookies are disabled.
We use cookies to make your experience better.To comply with the new e-Privacy directive, we need to ask for your consent to set the cookies. Learn more.
The Ai cold pad with 2-8C rechargeable Phase Change Material (PCM) is used to safely ship products with unique temperature constraints, like the Covid-19 vaccines. Dimensions: 10.25 x 10.25 x 0.75" (LxWxH).
Recommended SOP for Ai 2-8C and -25C thermal shipping box with PCM cold pads
Charging your PCM cold pads
2-8C: leave your PCM in a -18C freezer for 24 hours. Place PCM sideway, NOT upright, and leave 1 inch space between each PCM
-25C: leave your PCM in a -40C freezer for 24 hours. Place PCM sideway, NOT upright, and leave 1 inch space between each PCM
PCM is fully charged once the thermal fluid inside becomes solid
After removing from the freezer, leave PCM in room temperature for 15 minutes before use
Place one PCM in the bottom of the box, and then four PCM's alongside the inner walls of the box
Place your load into the box (empty space inside PCM will not affect duration)
Place your thermal data logger sensor, if required
Place the 6th PCM on top of your load
Close the VIP insulated cover and make sure it is tight
After 72 hours, replace all six PCM with new charged PCM
The Ai cold pad with 2-8C rechargeable Phase Change Material (PCM) is used to safely ship products with unique temperature constraints, like the Covid-19 vaccines. Dimensions: 10.25 x 10.25 x 0.75" (LxWxH).
Recommended SOP for Ai 2-8C and -25C thermal shipping box with PCM cold pads
Charging your PCM cold pads
2-8C: leave your PCM in a -18C freezer for 24 hours. Place PCM sideway, NOT upright, and leave 1 inch space between each PCM
-25C: leave your PCM in a -40C freezer for 24 hours. Place PCM sideway, NOT upright, and leave 1 inch space between each PCM
PCM is fully charged once the thermal fluid inside becomes solid
After removing from the freezer, leave PCM in room temperature for 15 minutes before use
Place one PCM in the bottom of the box, and then four PCM's alongside the inner walls of the box
Place your load into the box (empty space inside PCM will not affect duration)
Place your thermal data logger sensor, if required
Place the 6th PCM on top of your load
Close the VIP insulated cover and make sure it is tight
After 72 hours, replace all six PCM with new charged PCM